Our installation process revolves around these key principles:
- Safety - Not only for ourselves but for our customers and
observers.
- Protection Of Assets - This goes beyond the loss of our
tools. We ask that the homeowner remove anything of value from the work
area prior to our arrival.
- Efficiency and Quality of Work - We feel that the best
jobs are performed when there is minimal disruption to our customer and
installation is done right the first time.
Below you will find a more detailed listing of activities.
Before we arrive:
- Remove valuables that can be easily knocked over and broken.
In addition, please remove wall hangings/art.
- Make at least a 3 foot walkway for our ladders and crew.
- Big/heavy furniture that needs to be moved by our crew will be
assessed a small fee in addition to required damage waiver.
When we arrive:
- We prefer to set up our equipment in your driveway; weather
permitting. During bad weather, we would like the owners
recommendation on the best location to set up our equipment.
- We will place drop cloths to protect your flooring.
When the job is complete:
- Our set up area will be swept and cleaned of debris.
- A review is performed with the homeowner.
- Drop cloths are removed from the home.
- The homeowner enjoys their new moldings!